yesterday the tilers were finishing off the kids bathroom and kitchen. We used the opportunity to have a look at the progress made this week.
We were surprised to see that everything has been completed except for-
- Glass splash back
- Power point covers
- Bath, mirror and cabinet installation in kids bathroom.
Painters were there on Friday which is dissappointing as my SS went to great lengths of telling me they could not paint in the rain/ humidity due to potential for paint peeling. Yet, they were painting externally in the deluge of rain we had. Maybe my SS wasnt aware they were painting.
So in addition to the above the driveway and external painting needs to be completed.
I thought I would be really disappointed with the shelving in the butlers pantry. There is plenty of it and the quality is fantastic.
I still need to get the walk in robes measured for cabinetry. I am getting Mighty Kitchens - the company who is fitting out the Butlers pantry, to do soft close draws for our WIR.
Yesterday I ordered the plantation shutters from Quality Blinds an Shutters in Petersham. They have a 6 week production time.
Still loads to do, and plenty to buy. It is a little overwhelming. I have accepted that there is no way I can possibly buy everything before we move in. There isn't enough time. Little by little, bit by bit..
my iMac is fixed and I will pick it up tomorrow. Check back tomorrow night as I may have down/ uploaded a stack of photos for you.